OFFICE  KGDVS

OFFICE 117

DRYING HALL – Hulshout

This industrial building, part of the infrastructure for a large tree plantation in Brabant, sits in the middle of fields of potted plants of varying scales; its main purpose is a space to dry potted plants twenty-four hours before distribution. This building is the most extreme and simple incarnation of a big box: a building envelope removed from anything even vaguely referring to function—a true building without content. The process for drying plants requires currents of air to enter but meanwhile protection from rain; therefore the building is designed as a perforated perimeter with a closed roof. The perforations give the viewer the impression of an almost nonexisting building, a building through which one can still see the silhouettes of plants temporarily stored, a building that does not land in the ground but floats in space. Its simple geometry—the result of two colliding straight-angled triangles—gives the building multiple appearances from different vantage points. It sometimes appears box-like, sometimes a perforated plane. The interior of this simple yet massive structure is constructed of hybrid laminated wood beams, painted white, and steel columns, whose rhythmic placement sets the spatial experience.

Year

2011 – 2013

Location

Hulshout, BE

Type

Industrial,

Status

Built

Surface

2 240 m2

Client

Private

Collaborator(s)

UTIL Struktuurstudies

Design team

Kersten Geers, David Van Severen, Jan Lenaerts, Michael Langeder, Martin Dumont, Pierre Gernay, Michele Zanuso

Award

Steel Building Award 2016, winner
Prix Philippe Rotthier 2014, Honorable Mention 

Photographs

Bas Princen

Info